SA International Forum Homepage
Forum Home Forum Home > EnRoute FAMILY > General EnRoute
  New Posts New Posts RSS Feed - Island Fill Lead-In
  FAQ FAQ  Forum Search   Events   Register Register  Login Login

Island Fill Lead-In

 Post Reply Post Reply
Author
Message
hoderd View Drop Down
Apprentice
Apprentice


Joined: 10 November 2014
Location: United States
Points: 2
Post Options Post Options   Thanks (0) Thanks(0)   Quote hoderd Quote  Post ReplyReply Direct Link To This Post Topic: Island Fill Lead-In
    Software: OtherEnroute 5.1 w/ ATP  Level:
    Posted: 12 April 2017 at 2:32pm
Is there any way to get Enroute to honor the setting for lead-in at the midpoint of the longest segment with an island fill? We are getting constant cutter comp errors caused by the lead-in at the end of the line.
Moving the start point manually doesn't work because it always returns to the end of the line. 
Dave Hoder
------------------
Enroute 5.1 w/ ATP
Pathfinder 3D
Windows 10 Pro
Back to Top
paloalto_17 View Drop Down
Admin Group
Admin Group


Joined: 29 October 2012
Location: United States
Points: 215
Post Options Post Options   Thanks (0) Thanks(0)   Quote paloalto_17 Quote  Post ReplyReply Direct Link To This Post Software: OtherEnroute 5.1 w/ ATP  Level:
    Posted: 13 April 2017 at 11:17am
Hoderd,
 Unfortunately the way that the island fill applies its tool path does not allow it to follow the standard settings for the middle of the line or some other setting. I know that you can sometimes move the lead in depending on the tool paths. For the most part though the entry points for the Island fill are not that changeable.

Best Regards,
Aaron 


Back to Top
 Post Reply Post Reply
  Share Topic   

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 11.03
Copyright ©2001-2015 Web Wiz Ltd.